Neighbour ignores party wall notice in Twickenham
If your neighbour ignores a party wall notice, silence is not permission to start the notified work. The next step depends on the notice, its service and the rights being exercised. This guide explains how to organise the response without confusing a lack of reply with an objection to your whole project.
Identify the notice before counting days
Ask your surveyor whether the proposal concerns an existing party structure, excavation near a neighbouring building or a new wall at the boundary. These are different procedures. A new wall proposed astride a boundary does not acquire consent simply because the neighbour says nothing.
Keep the notice and its drawings. A conversation about an extension, a planning consultation letter and a correctly served statutory notice are different documents. Starting with the wrong one makes every later date unreliable.

Illustrative planning image.
Check ownership and service
The person next door may be a tenant rather than the only adjoining owner. Flats, leasehold interests and absentee owners can make the recipients less obvious than they appear from the street. Ask the appointed professional to establish who must receive what.
Record the service method, address and date. Do not assume a text message asking whether building work is acceptable completes the formal process. If service is uncertain, resolve that before treating a response period as expired.
Considering an extension, conversion or a new building project?
Trimble Architects provides architectural services for residential and commercial property projects across London and the surrounding areas, including:
Understand what silence changes
For party structure and relevant excavation notices, an unanswered notice can lead to a deemed dispute and the surveyor procedure. That is a statutory mechanism for resolving the notified matters, not a declaration that the neighbour has behaved unreasonably.
Keep discussions calm. A neighbour may be away or worried about damage. An explanatory conversation can still help, but it does not replace the necessary appointments, written responses or determination of the work.
Follow the appointment procedure
Where a dispute arises, the owners may agree on one surveyor or appoint their own surveyors under the Act. If an adjoining owner does not appoint, a further statutory request and appointment procedure may be available. Let your surveyor manage that sequence rather than improvising a deadline.
An award addresses relevant work and safeguards. It is not planning permission, a boundary determination or permission to change the design after agreement.

Illustrative planning image.
Allow a realistic construction programme
Tell your contractor which operations must wait. Distinguish a preferred start from a date cleared for affected work. Do not build a programme around an assumption that an award will arrive on a particular day.
If an engineer changes the excavation or an architect changes an opening, send the revisions to the surveyor. A notice based on an old drawing may no longer describe the operation intended. Keep contractual commitments consistent with those dependencies.
Keep evidence and resolve concerns promptly
File notices, drawings, appointments and decisions together. Log access arrangements and working hours separately from the statutory response process. This gives the team a reliable account without depending on recollections.
If there is disagreement about an award or your legal position, obtain advice promptly. The useful question is which procedure applies to the actual work, not how to pressure someone into signing. Stop affected work if the team has not established that it can lawfully proceed.
Figures and guidance checked
GOV.UK gives a 14-day written-response period in the relevant notice process and a 14-day court appeal period after an award is received. Party structure notices normally require at least two months' notice. These are statutory time periods, not predictions of a dispute's duration. Guidance checked 19 November 2026.
Before you take the next step
- Confirm the notice type and the owners who must receive it.
- Keep service records and the drawings issued.
- Ask the surveyor to confirm the next lawful step.
Summary: discuss party wall notices
An unanswered notice needs a correctly managed response, not an assumed consent. Check ownership and service, establish the applicable procedure and let it inform the programme. For work in Twickenham or Richmond, Trimble Architects can discuss the architectural proposals and party wall support needed before the affected work starts.